FCC Trustee Projects
This page serves as a one-stop list of all building- and facility-related projects at Friends Community Church. They will be separated by building with descriptions of scope and magnitude.
If you have any questions, if you finish a project, or if you notice something that needs to be added, please email travis@fccbrea.org.
Main building
Main Sanctuary
Sanctuary chairs need some cleaning/washing (and repairs if you know a guy)
Infant check-in desk; repair laminate gouge, add chair rail bumpers to cabinet face for strollers, wheelchairs and etc.
Repair water damage in men’s restroom ceiling, add kick down door stop to men’s door
Repair and/or replace emergency can light ballasts in all on main bldg
Replace bulbs or lamps in hallway lights (sm can Lts)
Clean/repair and or replace vinyl cove base throughout main bldg and sanc.
Add the rest of the metal corner guards on all corners of the building
Rest of Main building
Replace LED bulbs in all rooms and hallways
PRIORITY: Large classroom - it’s starting to get dark in there, so T8 bulb replacement is needed ASAP.
Replace lamps in main office hanging LTS. Estimate all new LED fixtures or retrofit bulbs
Clean/repair or replace vinyl cove base in all of second story rooms
Carpet replacement (quote on DEC 09)
315 Building
Main flex space
paint patching by stage
Front classrooms
Replace light bulbs in hanging and can lights
Repair Dutch door latch and add safety latch in pre-K classroom
Loft (upstairs attic)
Fix ducting
reorganize decorations
Exterior
New window decals needed for service times / RISE
307 Building
Warehouse
Inspect and fix open ceiling area near roll-up door (birds are getting into the building)
Paint ceiling black and screw in covers for skylights.
Re-do floor (contact Allie before doing this at allie@fccbrea.org)
Stretch net across ceiling (to block balls from hitting lights; contact Allie before doing this at allie@fccbrea.org)
Replace or fix LED fixtures that are out
Warehouse bathroom: Replace lightbulb (and maybe look into LED fixture replacement solutions)
Classrooms
Change flickering LED light strips
Paint scuffs
301 Building
Priority
Trade out hanging fluorescent fixtures for LED fixtures (talk to Tim B.)
Install stall door doorstops
repair ceiling paper in main room (water leak damage)
Add metal corner guards
Request upgrade from 5gal to 10gal H2O heater for kitchen (done?)